Elevator Design
The engineering stage where capacity, speed and shaft dimensions are calculated for the building’s layout and traffic.

A safe elevator starts with the first line on the drawing. A miscalculated pit depth, or a system whose capacity falls short of the building’s use, is not something maintenance can fix later. That is why we plan every project alongside the architectural drawings, with engineering calculations from the survey stage onwards.
Scope
- Full integration with the architectural design
- Drawings compliant with the Lifts Directive (2014/33/EU) and EN 81
- Calculations focused on energy efficiency
- 3D modelling and technical reporting
How does the process work?
We start by establishing the building’s structure and intended use: a residential block, a hotel, a hospital and a shopping centre generate very different traffic loads. The system type is then chosen by calculating rated load, car speed, car dimensions, pit depth, motor type and energy consumption. The resulting design is fitted into the building together with the architects and the contractor.
Why this stage should not be rushed
A poorly planned system may run without trouble for the first few years; the bill usually arrives later, as frequent breakdowns and early part replacements. Time spent on design pays for itself as lower operating costs over the system’s lifetime.
Who It’s For
Is this service right for you?
- Contractors and architects starting a new building project
- Owners with a finished architectural design who need the elevator calculations
- Building managements adding an elevator to an existing building
- Buildings changing use: from residential to office, hotel or clinic
Products
Components we use for this work
FAQ
About Elevator Design
The questions we are asked most about this service. General questions are on our services page.
Can’t find your answer?
We can talk through your elevator’s situation in a few minutes on the phone.
+90 533 624 25 41At what stage should you be involved in the elevator design?
Ideally before the structural work begins: the shaft dimensions, pit depth and any machine room are fixed at that stage, and changing them later is costly. If the architectural design is already finished, we check the capacity and shaft calculations against the existing drawings and report anything that needs correcting.
Should we choose an elevator with or without a machine room?
Machine-room-less (MRL) systems do not need a separate room on the roof, which makes them a common choice for new buildings. Systems with a machine room can be the better option where high capacity and speed are required, or where the building already has a machine room. The decision is made by calculation, based on the number of floors, shaft dimensions and traffic.
How are the capacity and number of elevators determined?
A traffic calculation is made from the number of floors, the number of flats or offices and the peak-hour traffic. The number of cars, their capacity and their speed needed to keep waiting times reasonable come out of that calculation. In buildings such as hospitals, stretcher dimensions are taken into account as well.
Can an elevator be added to an existing building that has none?
In most cases, yes. The stairwell, a suitable space inside the building or a new shaft added to the outside are all considered. Which solution is feasible is decided after an on-site assessment of the building’s structure and the dimensions required by the regulations.
Let’s find the right solution for your elevator together
A breakdown, a periodic maintenance agreement, a modernisation or a new project: whatever it is, it starts with one call. Our expert team assesses your building’s needs on site.






