An elevator’s life begins with design, is built through installation, protected by periodic maintenance and renewed through modernisation. We handle all four ourselves.
Elevator Design
The engineering stage where capacity, speed and shaft dimensions are calculated for the building’s layout and traffic.
Scope
Full integration with the architectural design
Drawings compliant with the Lifts Directive (2014/33/EU) and EN 81
Turkish regulations require every elevator to be maintained at least once a month by an authorised service company. On top of that, once a year an inspection body independent of the maintenance company inspects the elevator and issues its label. The two do not replace each other: if periodic maintenance slips, the chance of failing the annual inspection rises directly.
My elevator received a red label. What should I do?
A red label means the inspection found a defect that directly affects the safety of life, and the elevator is taken out of use. What needs to happen is to fix the defects listed in the report and put the elevator forward for re-inspection. We manage the whole process: we read the report and work out what must change, complete the work and apply for the re-inspection.
Can an elevator with a yellow label still be used?
Yes. A yellow label does not stop the elevator from being used; it says minor defects were found and must be fixed within the period set by the regulations. If they are not fixed in time, the label turns red and the elevator is taken out of use. In other words, a yellow label is not a penalty but a warning with a deadline.
My maintenance contract is with another company. Can I switch to you?
Yes. We maintain every make and model; the elevator does not have to be one we installed. The only thing that matters is the end date and termination terms of your current contract. Before taking over, we inspect the elevator on site and tell you in writing about its current condition and any defects we inherit.
Should I modernise my elevator or replace it completely?
If the shaft and supporting structure are sound, modernisation is usually both faster and more economical: the car, motor, control panel, door mechanisms and safety components are renewed and the system is brought up to the current standard. Full replacement usually comes up when the shaft itself does not meet today’s dimensions, or the building’s needs have changed fundamentally. Which is right becomes clear during the survey, and we present both options with their costs.
How long does elevator installation take?
There is no single figure: the number of floors, whether the shaft is ready, the chosen system type and the stage of construction all affect the time directly. That is why we give the timeline after the survey, specifically for your building; the quotation includes the expected schedule in writing alongside the price.
Which areas do you serve?
We are based in Gebze and carry out installation, maintenance and modernisation work in buildings across Kocaeli and the surrounding area. If you have a question about your building’s location, just call and we will tell you straight away whether we can serve it.
Let’s find the right solution for your elevator together
A breakdown, a periodic maintenance agreement, a modernisation or a new project: whatever it is, it starts with one call. Our expert team assesses your building’s needs on site.